Installation of thermal insulation internal layers and staged burner system of closed flare unit UFBG has been completed.

The maximum capacity by combusted gases will be over 285 tons/hour.

The height of the plant is 44 meters, the diameter of the combustion chamber is 19 meters, the diameter of the wind and noise fence is 26 meters.

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.
2019 year
The customer needed a regeneration gas heating furnace as part of the gas treatment unit.
2022 year
Bunter Group has completed installation of one of the two 019-P-1.1 and 019-P-1.2 furnace units manufactured for the condensate de-ethanization unit.
2021 year
Mobile indirect heating unit MUN-4-PNPT-4.25 was commissioned, which is designed to heat liquid due to the increase in the amount of incoming liquid and change of its parameters
2020 year
The water heating boiler unit was shipped to the Customer in full factory readiness. The installation works are currently in final stages. The commissioning is scheduled for September 2020.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности