Projects Modular water heating boiler unit

Year
2020
Category
Boiler plants
The water heating boiler unit was shipped to the Customer in full factory readiness. The installation works are currently in final stages. The commissioning is scheduled for September 2020.

The installed capacity of the boiler plant is 28 MW.
Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2020 year
Our set of AGNKS equipment consists of an external gas accumulator unit and a process enclosure-box.
2020 year
Gas treatment unit for auxiliaries is designed for purification, heating, and reduction of natural gas pressure of main gas pipelines to the required pressure and maintaining it with a specified accuracy before supplying to the consumer.
2021 year
Mobile indirect heating unit MUKN-0.12K was successfully commissioned.
2021 year
Another recuperator unit was manufactured and shipped to the customer, which is designed for combustion of permanent, periodic, and emergency gas discharges and their disposal by means of heat recovery for heating of recycled process water using the heat of exhaust gases.
2016 year
Water heating boiler plant UKM-0.8VGZh designed for heat supply of buildings and constructions has been shipped. Boiler plant is a process complex consisting of transportable pre-fabricated module.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности