The water heating boiler unit was shipped to the Customer in full factory readiness. The installation works are currently in final stages. The commissioning is scheduled for September 2020.

The installed capacity of the boiler plant is 28 MW.
Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2016 year
Four sets of KDFT pipe end phase dividers designed for separation of well production and formation water treatment to the required standards were supplied.
2021 year
Another recuperator unit was manufactured and shipped to the customer, which is designed for combustion of permanent, periodic, and emergency gas discharges and their disposal by means of heat recovery for heating of recycled process water using the heat of exhaust gases.
2022 year
Works on re-equipment and replacement of the flare stack were performed.
2021 year
Pre-commissioning works and mode adjustment of start-up and fuel gas heater PTPG-30M manufactured by Bunter Group has been carried out.
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности