Projects Flare tips

Year
2022
Category
Flare systems

Works on re-equipment and replacement of the flare stack were performed.

Unit capacity — 1,000,000 kg/h

Smokelessness range — 0...25,000 kg/h

Steam flow rate — 12,000 kg/h

Purge gas flow rate — 203.5 nm3/h

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2016 year
The pump station of industrial and fire-fighting water supply was successfully commissioned
2021 year
Heaters PNPT-3.87 designed to heat oil and their mixtures in the system of collection, transportation, and preparation of well products has been manufactured and shipped to the Customer.
2020 year
Capacitance water heater PVE-3.5 with heating capacity of 3.5 MW designed to heat water in the collection, transportation, and well product preparation systems is successfully operated.
2021 year
Pre-commissioning works and mode adjustment of start-up and fuel gas heater PTPG-30M manufactured by Bunter Group has been carried out.
2016 year
Four sets of KDFT pipe end phase dividers designed for separation of well production and formation water treatment to the required standards were supplied.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности