Mobile indirect heating unit MUN-4-PNPT-4.25 was commissioned, which is designed to heat liquid due to the increase in the amount of incoming liquid and change of its parameters
Scope of works carried out during the design, delivery, and start-up:
-
- - design and development of design documentation;
- - manufacturing and testing of MUN units at the manufacturer's plant;
- - supply and placement of MUN equipment units;
- - construction and installation works to connect the equipment to the existing communications and power supply systems;
- - commissioning and individual testing (delivery of executive documentation);
- - comprehensive testing (mode adjustment) and personnel training;
- - obtaining a positive conclusion of the expert examination of industrial safety and transfer of the documents of title.
-
Would you like to discuss your project?
Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible
Other projects
2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2020 year
Capacitance water heater PVE-3.5 with heating capacity of 3.5 MW designed to heat water in the collection, transportation, and well product preparation systems is successfully operated.
2020 year
Our set of AGNKS equipment consists of an external gas accumulator unit and a process enclosure-box.
2021 year
Newly designed indirect heater has been manufactured and shipped to the Customer.
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.