The pump station of industrial and fire-fighting water supply was successfully commissioned.

Pump station building of industrial-fire water supply, overall dimensions 6000x9000x3000 (h) m, code 1156P-UP-62, is designed for controlled delivery to the fire water supply network and ensure water circulation in the fire-fighting water lines. 

The pump station is designed to house 2 groups of pumps which supply water for fire-fighting, production, and circulation purposes.

The facility has been designed in accordance with safety, industrial sanitation, occupational health, fire and explosion safety, and environmental protection regulations in force in the Russian Federation.

The scope of equipment of the modular pump station ensures functional suitability and full operability.

All supplied equipment, devices, and materials comply with the regulations, rules, and standards in force in the Russian Federation at the time of commissioning.  

Calculation and selection of parameters, as well as the development of a full set of design documentation was carried out by proprietary design department.

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2016 year
Four sets of KDFT pipe end phase dividers designed for separation of well production and formation water treatment to the required standards were supplied.
2016 year
Water heating boiler plant UKM-0.8VGZh designed for heat supply of buildings and constructions has been shipped. Boiler plant is a process complex consisting of transportable pre-fabricated module.
2021 year
Another recuperator unit was manufactured and shipped to the customer, which is designed for combustion of permanent, periodic, and emergency gas discharges and their disposal by means of heat recovery for heating of recycled process water using the heat of exhaust gases.
2020 year
A recuperator unit designed for beneficial use of the combustion heat of excessive flow of associated petroleum gas has been shipped.
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности