Projects Modular boiler unit UKM-0.8VGZh

Year
2016
Category
Boiler plants

Water heating boiler plant UKM-0.8VGZh designed for heat supply of buildings and constructions has been shipped. Boiler plant is a process complex consisting of transportable pre-fabricated module.

The installed capacity of the boiler plant is 0.8 MW
Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2022 year
Works on re-equipment and replacement of the flare stack were performed.
2021 year
Fuel gas treatment unit is designed for preparation of fuel gas for the boiler unit of UKPG-1, gas for the methanol regeneration unit, gas for the flare system VD, ND, and UGG (purification, heating, flow measurement, and gas pressure reduction before supplying to the consumer).
2022 year
Bunter Group has completed installation of one of the two 019-P-1.1 and 019-P-1.2 furnace units manufactured for the condensate de-ethanization unit.
2019 year
This is an auxiliary unit for operation of the main equipment of booster compressor station (BCS).
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности