Bunter Group has completed installation of one of the two 019-P-1.1 and 019-P-1.2 furnace units manufactured for the condensate de-ethanization unit. The furnaces are designed for heating and evaporation of light fractions in gas condensate. The capacity of the unit is up to 277,000 kg per hour. The useful heat output of the furnaces is 13.7 MW.

The furnace was started up on June 13. After concrete drying, the furnace operates at temperatures and flow rates higher than nominal modes, providing the de-ethanization column with raw materials of necessary specifications. The actual efficiency of the furnace corresponds to the calculated values.

Cylinder furnaces manufactured by the Bunter Group are supplied to the customer with fuel gas preparation units, inlet product lines, and outlet product lines. Frame valve blocks provide fuel gas supply to pilot and main burners, its reduction, flow measurement, and purification from mechanical impurities. Product line units ensure that the product is evenly distributed across the two coil streams.

The pipeline connection between furnaces and control system with process controller and emergency protection controller allows the furnace to be operated safely in accordance with federal standards and regulations.

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2021 year
Another recuperator unit was manufactured and shipped to the customer, which is designed for combustion of permanent, periodic, and emergency gas discharges and their disposal by means of heat recovery for heating of recycled process water using the heat of exhaust gases.
2016 year
Four sets of KDFT pipe end phase dividers designed for separation of well production and formation water treatment to the required standards were supplied.
2021 year
Installation of thermal insulation internal layers and staged burner system of closed flare unit UFBG has been completed.

2020 year
The water heating boiler unit was shipped to the Customer in full factory readiness. The installation works are currently in final stages. The commissioning is scheduled for September 2020.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности