Projects Combustion chamber of the agent heating unit UNA-20.5-15-2.3-1

Year
2020
Category
Flare systems

A recuperator unit designed for beneficial use of the combustion heat of excessive flow of associated petroleum gas has been shipped.

Unit capacity by coolant heating is 42 m3/h.

Capability by recycled gas is 860 nm3/h.

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2020 year
Gas treatment unit for auxiliaries is designed for purification, heating, and reduction of natural gas pressure of main gas pipelines to the required pressure and maintaining it with a specified accuracy before supplying to the consumer.
2020 year
The water heating boiler unit was shipped to the Customer in full factory readiness. The installation works are currently in final stages. The commissioning is scheduled for September 2020.
2016 year

Pump station enclosure-box is successfully operated above the artesian well.

2022 year
Works on re-equipment and replacement of the flare stack were performed.
2021 year
Mobile direct heating unit MUPN of the formation water separation system was put into operation to provide heating of the incoming liquid with subsequent separation of produced water in the settling units.

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности