Year
2020
Category
Oil and gas equipment
Capacitance water heater PVE-3.5 with heating capacity of 3.5 MW designed to heat water in the collection, transportation, and well product preparation systems is successfully operated.
The design was carried out by the design department specialists.
The design was carried out by the design department specialists.
Would you like to discuss your project?
Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible
Other projects
2021 year
Installation of thermal insulation internal layers and staged burner system of closed flare unit UFBG has been completed.
2019 year
The customer needed a regeneration gas heating furnace as part of the gas treatment unit.
2016 year
Pump station enclosure-box is successfully operated above the artesian well.
2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2021 year
Fuel gas treatment unit is designed for preparation of fuel gas for the boiler unit of UKPG-1, gas for the methanol regeneration unit, gas for the flare system VD, ND, and UGG (purification, heating, flow measurement, and gas pressure reduction before supplying to the consumer).