Projects Modular boiler plant UKM-1.7VG

Year
2020
Category
Boiler plants

A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.

Would you like to discuss your project?

Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible

Other projects
2018 year
Pump station of fire-fighting water supply has been commissioned.
2020 year
Our set of AGNKS equipment consists of an external gas accumulator unit and a process enclosure-box.
2021 year
Pre-commissioning works and mode adjustment of start-up and fuel gas heater PTPG-30M manufactured by Bunter Group has been carried out.
2016 year
The pump station of industrial and fire-fighting water supply was successfully commissioned
2021 year
Mobile indirect heating unit MUN-4-PNPT-4.25 was commissioned, which is designed to heat liquid due to the increase in the amount of incoming liquid and change of its parameters

На этом веб-сайте используются файлы cookie, которые обеспечивают работу всех функций для наиболее эффективной навигации по странице. Если вы не хотите принимать постоянные файлы cookie, пожалуйста, выберите соответствующие настройки на своем компьютере. Продолжая навигацию по сайту, вы предоставляете свое согласие на использование файлов cookie на этом веб-сайте. Более подробная информация предоставляется в нашей политике конфиденциальности