Year
2021
Category
Process comlexes
Mobile direct heating unit MUPN of the formation water separation system was put into operation to provide heating of the incoming liquid with subsequent separation of produced water in the settling units.
The design was carried out by the design department specialists. The device was manufactured at the Syzran plant.
Would you like to discuss your project?
Our team is ready to implement a project of any complexity.
If you have assignments or questions, leave a request and we will contact you as soon as possible
Other projects
2021 year
Fuel gas treatment unit is designed for preparation of fuel gas for the boiler unit of UKPG-1, gas for the methanol regeneration unit, gas for the flare system VD, ND, and UGG (purification, heating, flow measurement, and gas pressure reduction before supplying to the consumer).
2016 year
Water heating boiler plant UKM-0.8VGZh designed for heat supply of buildings and constructions has been shipped. Boiler plant is a process complex consisting of transportable pre-fabricated module.
2020 year
A boiler plant, which is an integral part of the gas treatment unit and is designed to compensate the temperature drop during gas pressure reduction and fuel gas heating for GPA, has been shipped and commissioned.
2019 year
The Customer faced a non-standard task: oil emulsion needed to be heated directly from the well pad in the absence of prepared fuel gas to feed the heater burners and the remaining infrastructure around the well pad.
2019 year
This is an auxiliary unit for operation of the main equipment of booster compressor station (BCS).